Abstract:
|
The present project has been carried out with the aim of deepening the study of
everything that refers to the facilities of an industrial warehouse. In particular, the ACS
facilities, lighting, fire protection measures, air conditioning, electrification, pneumatic
installation and installation of cold water have been designed in a cardboard
manufacturing plant. Each installation has been designed taking into account the
different regulations in force, all mentioned throughout the descriptive memory.
The calculations made in each of the different sections, as well as the documents that
have served as guideline throughout the study, are included within the annexes. Finally,
the third document is constituted by the different plans, which contain graphic
information aimed at making the study more compressible. |