A two-stage stochastic programming model for scheduling replacements in sow farms

dc.contributor.author
Rodríguez Sánchez, Sara Verónica
dc.contributor.author
Albornoz Sanhueza, Victor Manuel
dc.contributor.author
Pla Aragonés, Lluís Miquel
dc.date.accessioned
2024-12-05T21:32:22Z
dc.date.available
2024-12-05T21:32:22Z
dc.date.issued
2016-06-13T08:20:26Z
dc.date.issued
2009
dc.identifier
https://doi.org/10.1007/s11750-009-0087-2
dc.identifier
1134-5764
dc.identifier
http://hdl.handle.net/10459.1/57183
dc.identifier.uri
http://hdl.handle.net/10459.1/57183
dc.description.abstract
This paper presents a formulation and resolution of a two-stage stochastic linear programming model with recourse for sow farms producing piglets. The proposed model considers a medium-term planning horizon and specifically allows optimal replacement and schedule of purchases to be obtained for the first stage. This model takes into account sow herd dynamics, housing facilities, reproduction management, herd size with initial and final inventory of sows and uncertain parameters such as litter size, mortality and fertility rates. These last parameters are explicitly incorporated via a finite set of scenarios. The proposed model is solved by using the algebraic modelling software OPL Studio from ILOG, in combination with the solver CPLEX to solve the linear models resulting from different instances considered. The article also presents results obtained with previous deterministic models assessing the suitability of the stochastic approach. Finally, the conclusions drawn from the study including an outlook are presented.
dc.description.abstract
Sara V. Rodríguez would like to thank CONACYT (Consejo Nacional de Ciencia y Tecnología, Mexico) and the Department of Universities and Information Society (autonomous government of Catalonia, Spain) for the grant received during the development of this study. Victor M. Albornoz wishes to acknowledge the Dirección General de Investigación y Postgrado of the Universidad Técnica Federico Santa María, Grant USM No. 28.08.52. Lluís M. Plà wishes to acknowledge the financial support of the Spanish Research Program (MTM2005-09362-C03-02).
dc.language
eng
dc.publisher
Springer Verlag
dc.relation
MIECI/PN2004-2007/MTM2005-09362-C03-02
dc.relation
Versió postprint del document publicat a https://doi.org/10.1007/s11750-009-0087-2
dc.relation
Top, 2009, vol. 17, núm. 1, p. 171-189
dc.rights
(c) Sociedad de Estadística e Investigación Operativa, 2009
dc.rights
info:eu-repo/semantics/openAccess
dc.subject
Replacement
dc.subject
Planning
dc.subject
Stochastic programming
dc.subject
Sow herd management
dc.title
A two-stage stochastic programming model for scheduling replacements in sow farms
dc.type
article
dc.type
acceptedVersion


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)