Ericsson to Huawei Swap RAN Sites

dc.contributor
Universitat Politècnica de Catalunya. Departament d'Enginyeria Telemàtica
dc.contributor
Alcober Segura, Jesús Ángel
dc.contributor.author
Baloyan, Abdulkareem Mohammed Ibrahim
dc.date.issued
2025-02-07
dc.identifier
https://hdl.handle.net/2117/428064
dc.identifier
PRISMA-193132
dc.description.abstract
In the Telecommunication Industry - Mobile Communications Sector, this master's thesis provides a practical inclusive framework for managing telecom infrastructure projects and offering worthy lessons for Project Managers (PMs). To do so, we are presenting the practical telecom project, which is the execution of telecom infrastructure of the modernization project involving the swap of the Radio Access Network (RAN) across 60 sites from Ericsson to more advanced Huawei technology as the case study, which closely mirrors real-world scenarios. This thesis is built in the environment drawing on information and data from real cases. For this thesis, 'TelecomCo' Operator and 'TechCom' Telecom Subcontractor are not real names. TechCom executes the modernization project, is responsible for deploying Huawei infrastructure, and is committed to the main objective, which is handing over the modernization project by the end of Q4 2024. TechCom hired me (Abdulkareem Baloyan) as the PM on this project. This thesis displays a worthy real study of the PMs. To perform this, I will utilize a body of knowledge, tools, and techniques to manage this project professionally. Thus, this master thesis presents the role of the PM, which is centered on overseeing the entire project lifecycle and applying the body of knowledge, which is the management processes outlined in A Guide to the Project Management Body of Knowledge (PMBOK® Guide) sixth edition issued by the Project Management Institute, by aligning the modernization project implementation with the principles of (PMBOK® Guide), ensuring the project meets both technical and business objectives. On the other hand, as the PM, I have to apply successful tools and techniques that will be utilized to manage the project effectively, such as MS Project Professional for the planning phase and Microsoft Office Library during the execution, monitoring, and control phases. Work performance reports and documents will also be continuously updated during project stages.
dc.format
application/pdf
dc.language
eng
dc.publisher
Universitat Politècnica de Catalunya
dc.rights
http://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.rights
Open Access
dc.subject
Àrees temàtiques de la UPC::Enginyeria de la telecomunicació
dc.subject
Telecommunication systems
dc.subject
Mobile communication systems
dc.subject
Cell phone systems
dc.subject
Radio Access Network (RAN)
dc.subject
Huawei Technology
dc.subject
TechCom Telecom Subcontractor
dc.subject
Project Management Institute (PMI)
dc.subject
Telecom Infrastructure Projects
dc.subject
Mobile Communications Sector
dc.subject
Telecomunicació, Sistemes de
dc.subject
Comunicacions mòbils, Sistemes de
dc.subject
Telefonia mòbil
dc.title
Ericsson to Huawei Swap RAN Sites
dc.type
Master thesis


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)