Universitat Politècnica de Catalunya. Departament d'Organització d'Empreses
Universitat Politècnica de Catalunya. SIR-OPE - Service and Industrial Robotics - Operation, Production and Enterprise
2024-04-26
A sequence problem is presented in production lines of mixed fixed-cycle models and time windows with the aim of minimizing production losses in the line and taking into account two types of restrictions: leveling of Heijunka production and suppression of buffers between workstations. The proposed problem is solved by mixed integer linear programming (MILP) using the IBM-CPLEX solver on the set of 23 Nissan-9Eng.I instances. It is concluded that the economic impact due to incremental production losses is significant when the buffers are suppressed in the production line, being of the order of €2600/day.
Work subsidized by the Ministry of Science and Innovation of the Government of Spain / FEDER through the OPTHEUS project (ref. PGC2018–095080-B-I00)
Postprint (author's final draft)
Part of book or chapter of book
English
Àrees temàtiques de la UPC::Economia i organització d'empreses::Direcció d'operacions; Mixed model sequencing problem; Blocking flowshop; Heijunka; Mixed integer linear programming; IBM-CPLEX solver
Springer
https://link.springer.com/book/10.1007/978-3-031-57996-7
Restricted access - publisher's policy
E-prints [72986]