Mixed-Model Sequencing Problem with overload minimization considering workstations dependencies

dc.contributor
Universitat Politècnica de Catalunya. Departament d'Organització d'Empreses
dc.contributor
Universitat Politècnica de Catalunya. Institut d'Organització i Control de Sistemes Industrials
dc.contributor
Universitat Politècnica de Catalunya. OPE - Organització de la Producció i d'Empresa (aspectes tècnics, jurídics i econòmics en Producció)
dc.contributor
Universitat Politècnica de Catalunya. SIR - Service and Industrial Robotics
dc.contributor.author
Bautista Valhondo, Joaquín
dc.contributor.author
Suárez Feijóo, Raúl
dc.date.issued
2009-11-17
dc.identifier
Bautista, J., Suarez, R. Mixed-Model Sequencing Problem with overload minimization considering workstations dependencies. A: "IEEE International Symposium on Assembly and Manufacturing, 2009. ISAM 2009". Los Alamitos (California): IEEE Computer Society Conference Publishing Services (CPS), 2009, p. 351-357.
dc.identifier
978-1-4244-4627-8
dc.identifier
https://hdl.handle.net/2117/89575
dc.description.abstract
Proceedings of T2B.3 2009 IEEE International Symposium on Assembly and Manufacturing 17-20 November 2009, Suwon, Korea 978-1-4244-4628-5/09/$25.00 ©2009 IEEE Mixed-model sequencing problem with overload minimization considering workstations dependencies Joaqu ́ ın Bautista and Ra ́ ul Su ́ arez Abstract — This paper reviews the formulation of the Mixed Model Sequencing Problem with Workload minimization (MMSP-W). Two significative models already presented in the literature are describe, showing that they are valid for the case of parallel workstations, but do not properly solve the case of serial workstations. After that, a new model is introduced that is valid for the case of serial workstations. An example is used to illustrate the performance of all the models, and a computational experience was done to verify the applicability of the proposed model using the solver CPLEX and a set of problem instances of small dimension adapted from the literature.
dc.description.abstract
Postprint (published version)
dc.format
7 p.
dc.format
application/pdf
dc.language
eng
dc.publisher
IEEE Computer Society Conference Publishing Services (CPS)
dc.relation
http://ieeexplore.ieee.org/xpl/mostRecentIssue.jsp?punumber=5367681
dc.rights
http://creativecommons.org/licenses/by-nc-nd/3.0/es/
dc.rights
Restricted access - publisher's policy
dc.subject
Àrees temàtiques de la UPC::Economia i organització d'empreses
dc.subject
Just-in-time-systems
dc.subject
Workstations
dc.subject
Manufacturing processes
dc.subject
Pulp manufacturing
dc.subject
Virtual manufacturing
dc.subject
Computational modeling
dc.subject
Robots
dc.subject
Robotic assembly
dc.subject
Production facilities
dc.subject
Measurement units
dc.subject
Particle measurements
dc.subject
Just a temps (Sistema)
dc.subject
Treball -- Productivitat
dc.title
Mixed-Model Sequencing Problem with overload minimization considering workstations dependencies
dc.type
Part of book or chapter of book


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

E-prints [73026]